The Stadium concrete pour was done with a boom truck that was able to utilize the long-range mobility of the pipes. Through holes in the floor and bleachers, we were able to pour a foundation underneath, resulting in time saved compared to using a trailer pump. With levelers at the ready, we were able to pour and level the concrete in record time, making for a smooth and efficient process. Our use of the boom truck allowed for precise placement and minimal disturbance to the surrounding area. Our team at CC Pumping Services Inc is dedicated to finding the most efficient and effective solutions for our clients’ construction needs.







