801 Central Concrete was poured with the use of our placing boom. Placing booms are able to be put up and taken down anywhere on a job site that allows it. With these, we were able to pump from the top of a job site while the concrete sat at ground level. This allows for a streamlined process as everything moves with minimal effort. These pumps are also cheaper to operate than boom pumps and take up less space.